EV CHARGER RESILIENCE INDEXAFDC SNAPSHOT · SEP 16, 2026
ChargerGradeKnow your fallback
Available in AFDC snapshot

ARCO E Street, Marysville, CA

This public DC fast-charging location received grade B (82/100) from 4 listed ports, 5 alternative sites within 10 miles, access hours, connectors, and the September 16, 2026 AFDC snapshot.

707 E Street, Marysville, CA 95901

This station earns a B because its physical redundancy and nearby fallbacks are strong. This is a resilience estimate—not measured uptime.

CHARGER
GRADE
B82/100
DC fast ports4at this address
24/7 accessYes
Backups within 10 mi5
Nearest other network2.1 mi
THE INSPECTION CARD

Why ARCO E Street, Marysville, CA scored 82

ARCO E Street, Marysville, CA received grade B (82/100) from 4 listed DC fast ports, 5 nearby fallback sites, 5 other nearby networks, and listed 24/7 access.

Official statusAvailable20/20
Port redundancy4 DC fast ports12/25
Around-the-clock access24/7 listed15/15
Nearby fallbacks5 sites within 10 miles15/15
Network diversity5 other networks within 25 miles10/10
Connector coverageCCS5/10
Record freshnessUpdated 0 days before snapshot5/5
Before you drive

AFDC is a planning dataset, not a live operations feed. Confirm connector compatibility, pricing and current availability in the operator’s app.

Fast-charging fallbacks near ARCO E Street, Marysville, CA

AFDC lists 6 alternative DC fast-charging sites within 25 straight-line miles of ARCO E Street, Marysville, CA; the nearest listed alternative is 2.1 miles away.

StationDistanceCapacityStatus
PetsMart CentereVgo Network2.1 mi2 portsTemporarily unavailable
Target T0318 (Yuba City, CA)Electrify America2.4 mi4 portsAvailable
Marysville, CA - Tesla SuperchargerTesla2.9 mi8 portsAvailable
Yuba City, CA - Tesla SuperchargerTesla3.1 mi10 portsAvailable
ARCO Harter Pkwy Yuba City, CABP_PULSE3.5 mi6 portsAvailable
Gridley Country FordFORD_CHARGE16.4 mi2 portsAvailable