EV CHARGER RESILIENCE INDEXAFDC SNAPSHOT · SEP 16, 2026
ChargerGradeKnow your fallback
Available in AFDC snapshot

Carter Oak Crossing

This public DC fast-charging location received grade B (82/100) from 4 listed ports, 50 alternative sites within 10 miles, access hours, connectors, and the September 16, 2026 AFDC snapshot.

5495 Jimmy Carter Blvd, Norcross, GA 30093

This station earns a B because its physical redundancy and nearby fallbacks are strong. This is a resilience estimate—not measured uptime.

CHARGER
GRADE
B82/100
DC fast ports4at this address
24/7 accessYes
Backups within 10 mi50
Nearest other network0.1 mi
THE INSPECTION CARD

Why Carter Oak Crossing scored 82

Carter Oak Crossing received grade B (82/100) from 4 listed DC fast ports, 50 nearby fallback sites, 21 other nearby networks, and listed 24/7 access.

Official statusAvailable20/20
Port redundancy4 DC fast ports12/25
Around-the-clock access24/7 listed15/15
Nearby fallbacks50 sites within 10 miles15/15
Network diversity21 other networks within 25 miles10/10
Connector coverageCCS, CHAdeMO5/10
Record freshnessUpdated 0 days before snapshot5/5
Before you drive

AFDC is a planning dataset, not a live operations feed. Confirm connector compatibility, pricing and current availability in the operator’s app.

Fast-charging fallbacks near Carter Oak Crossing

AFDC lists 6 alternative DC fast-charging sites within 25 straight-line miles of Carter Oak Crossing; the nearest listed alternative is 0.1 miles away.

StationDistanceCapacityStatus
Norcross, GA - Live Oak Parkway - Tesla SuperchargerTesla0.1 mi16 portsAvailable
GEORGIA POWER NORCROSS DC2ChargePoint Network0.6 mi1 portAvailable
GEORGIA POWER NORCROSS DC1ChargePoint Network0.6 mi1 portAvailable
Target Peachtree Corners #T0982eVgo Network3.4 mi4 portsAvailable
Tucker, GA - Tesla SuperchargerTesla3.8 mi12 portsAvailable
Nalley Nissan - AtlantaNon-Networked4.5 mi2 portsAvailable