EV CHARGER RESILIENCE INDEXAFDC SNAPSHOT · SEP 16, 2026
ChargerGradeKnow your fallback
Available in AFDC snapshot

Duke Farms

This public DC fast-charging location received grade C (68/100) from 4 listed ports, 11 alternative sites within 10 miles, access hours, connectors, and the September 16, 2026 AFDC snapshot.

1112 Dukes Parkway West, Hillsborough, NJ 08844

This station earns a C because its physical redundancy and nearby fallbacks are mixed. This is a resilience estimate—not measured uptime.

CHARGER
GRADE
C68/100
DC fast ports4at this address
24/7 accessNot listed
Backups within 10 mi11
Nearest other network3.5 mi
THE INSPECTION CARD

Why Duke Farms scored 68

Duke Farms received grade C (68/100) from 4 listed DC fast ports, 11 nearby fallback sites, 18 other nearby networks, and no explicit 24/7 listing.

Official statusAvailable20/20
Port redundancy4 DC fast ports12/25
Around-the-clock accessNot listed as 24/70/15
Nearby fallbacks11 sites within 10 miles15/15
Network diversity18 other networks within 25 miles10/10
Connector coverageCCS, CHAdeMO5/10
Record freshnessUpdated 0 days before snapshot5/5
Before you drive

AFDC is a planning dataset, not a live operations feed. Confirm connector compatibility, pricing and current availability in the operator’s app.

Fast-charging fallbacks near Duke Farms

AFDC lists 6 alternative DC fast-charging sites within 25 straight-line miles of Duke Farms; the nearest listed alternative is 3.5 miles away.

StationDistanceCapacityStatus
Bridgewater NissanNon-Networked3.5 mi1 portAvailable
Bridgewater, NJ - Tesla SuperchargerTesla3.6 mi8 portsAvailable
Target T1224 (Bridgewater, NJ)Electrify America3.9 mi3 portsAvailable
QUICKCHEK CP- QC186-2ChargePoint Network6.5 mi1 portTemporarily unavailable
QUICKCHEK CP-QC186-1ChargePoint Network6.5 mi1 portAvailable
South Brunswick, NJ Rechargery Relay @ Wawa - Rt 27IONNA8.8 mi10 portsAvailable