EV CHARGER RESILIENCE INDEXAFDC SNAPSHOT · SEP 16, 2026
ChargerGradeKnow your fallback
Available in AFDC snapshot

Romeo Chevrolet

This public DC fast-charging location received grade B (75/100) from 3 listed ports, 20 alternative sites within 10 miles, access hours, connectors, and the September 16, 2026 AFDC snapshot.

1665 Ulster Ave, Lake Katrine, NY 12449

This station earns a B because its physical redundancy and nearby fallbacks are strong. This is a resilience estimate—not measured uptime.

CHARGER
GRADE
B75/100
DC fast ports3at this address
24/7 accessYes
Backups within 10 mi20
Nearest other network0.1 mi
THE INSPECTION CARD

Why Romeo Chevrolet scored 75

Romeo Chevrolet received grade B (75/100) from 3 listed DC fast ports, 20 nearby fallback sites, 13 other nearby networks, and listed 24/7 access.

Official statusAvailable20/20
Port redundancy3 DC fast ports9/25
Around-the-clock access24/7 listed15/15
Nearby fallbacks20 sites within 10 miles15/15
Network diversity13 other networks within 25 miles10/10
Connector coverageCCS5/10
Record freshnessUpdated 225 days before snapshot1/5
Before you drive

AFDC is a planning dataset, not a live operations feed. Confirm connector compatibility, pricing and current availability in the operator’s app.

Fast-charging fallbacks near Romeo Chevrolet

AFDC lists 6 alternative DC fast-charging sites within 25 straight-line miles of Romeo Chevrolet; the nearest listed alternative is 0.1 miles away.

StationDistanceCapacityStatus
DCFCEVOKE0.1 mi1 portAvailable
Van Kleecks TireVIALYNK0.8 mi4 portsAvailable
HondoGO - Kingston, NYEVGATEWAY0.9 mi4 portsAvailable
PRESHYUN PKG 1ChargePoint Network1.6 mi1 portAvailable
PRESHYUN PKG 2ChargePoint Network1.6 mi1 portAvailable
Lia Honda KingstonQUICKCHARGE1.7 mi2 portsAvailable