Summit Ford

This public DC fast-charging location received grade D (45/100) from 4 listed ports, 0 alternative sites within 10 miles, access hours, connectors, and the September 16, 2026 AFDC snapshot.

100 Summit Drive, Beaver Dam, WI 53916

This station earns a D because its physical redundancy and nearby fallbacks are limited. This is a resilience estimate—not measured uptime.

CHARGER
GRADE
D45/100
DC fast ports4at this address
24/7 accessNot listed
Backups within 10 mi0
Nearest other network15 mi
THE INSPECTION CARD

Why Summit Ford scored 45

Summit Ford received grade D (45/100) from 4 listed DC fast ports, 0 nearby fallback sites, 1 other nearby network, and no explicit 24/7 listing.

Official statusAvailable20/20
Port redundancy4 DC fast ports12/25
Around-the-clock accessNot listed as 24/70/15
Nearby fallbacks0 sites within 10 miles0/15
Network diversity1 other network within 25 miles2/10
Connector coverageCCS5/10
Record freshnessUpdated 0 days before snapshot5/5
Before you drive

AFDC is a planning dataset, not a live operations feed. Confirm connector compatibility, pricing and current availability in the operator’s app.

Fast-charging fallbacks near Summit Ford

AFDC lists 1 alternative DC fast-charging site within 25 straight-line miles of Summit Ford; the nearest listed alternative is 14.9 miles away.

StationDistanceCapacityStatus
Napleton Columbus FordEV Connect14.9 mi4 portsAvailable